Site/Subdivision Plans –
CVS at Cary Park - 07-SP-040-A
The plan document files and images contained on this site are not considered record or as-built drawings, and therefore should not be relied upon or used in such manner.
01_CoverSheet
|
02_RecordedPlan_SPL-01(1.9 MB)
|
03_SitePlan_CSP-01(1.7 MB)
|
04_UtilityPlan_CUP-01(1.5 MB)
|
05_GradingAndDrainagePlan_CGP-01(1.5 MB)
|
06_SoilErosionControlPlan_CEC-01(1.4 MB)
|
07-SP-040-A_20100423_0001(2.2 MB)
|
07_SiteDetails_CDT-01(1.3 MB)
|
08_StormDrainageAndErosionControlDetails_CDT-02(1.5 MB)
|
09_WaterAndSewerDetails_CDT-03(1.1 MB)
|
10_FloorPlansAndDetails_A1(1.3 MB)
|
11_ExteriorElevations_A4(1.8 MB)
|
12_BuildingSections_A4-1
|
13_MaterialsAndCompositionOverlay_SAC1(1.5 MB)
|
14_ScaleOverlay_SAC2(1.4 MB)
|
15_ProportionOverlay_SAC3(1.6 MB)
|
16_RhythmAndTransparencyOverlay_SAC4(1.6 MB)
|
17_ArticulationAndExpressionOverlay_SAC5(1.5 MB)
|
18_ColorOverlay_SAC6(1.8 MB)
|
19_Photometrics_ES2(1.1 MB)
|
20_LandscapePlan_L1(1.6 MB)
|
21_IrrigationPlan_L2(1.2 MB)
|





















