Site/Subdivision Plans –

Cary Towne Center Redevelopment - 16-SP-020

The plan document files and images contained on this site are not considered record or as-built drawings, and therefore should not be relied upon or used in such manner.

Site/Subdivision Plan Index

001 - C000 Cover

(1.3 MB)

002 - C001 Existing Conditions

003 - C002 Demolitions Plan

004 - C100 Site Plan

005 - C120 Fire Access Route

006 - C200 Utility Plan

007 - C300 Grading and Drainage Plan

008 - C400 Erosion Control Plan

(1.5 MB)

009 - C600 Landscaping Plan

(1.4 MB)

010 - C700 Details

(1.3 MB)

011 - C701 Details

(1.3 MB)

012 - C702 Details

(1.5 MB)

013 - C703 Details

(1.2 MB)

014 - SE0.1 SITE PLAN-LANDSCAPE CLEARANCES

(19.3 MB)

015 - SE0.2 SITE PLAN-PHOTOMETRIC 24x36 (1)

016 - A-000 - SITE CONSIDERATIONS PLANS AND ELEVATIONS

017 - A-003 - MATERIALS SELECTION BOARD

(5.8 MB)

018 - A-101 - FIRST FLOOR PLAN

019 - A-203 - MATERIALS OVERLAY

020 - A-204 - COMPOSITION OVERLAY

021 - A-205 - SCALE OVERLAY

022 - A-206 - PROPORTION OVERLAY

023 - A-207 - RHYTHM OVERLAY

024 - A-208 - TRANSPARENCY OVERLAY

025 - A-209 - ARTICULATION OVERLAY

026 - A-210 - EXPRESSION OVERLAY

027 - A-211 - COLOR OVERLAY

(5.0 MB)