Site/Subdivision Plans –

Verizon Wireless at Greenwood BaptistChurch - 09-SP-024

The plan document files and images contained on this site are not considered record or as-built drawings, and therefore should not be relied upon or used in such manner.

Site/Subdivision Plan Index

01_CoverSheet_T1

02_GeneralNotes_T2

03_SiteSurvey

(1.2 MB)

04_OverallSitePlan_C0

05_SitePlan_C1

06_GradingAndDrainagePlan_C2

07_EquipmentPadDetails_C3

10_GeneratorPadDetailsAndNotes_C4

11_BrickWallEnclosureAndGateDetail_C5

12_CoaxAndTowerElevationDetails_C6

(1.0 MB)

13_BioretentionDetails_C7

14_BioretentionDetails_C8

15_BioretentionDetails_C9

16_BioretentionDetails_C10

17_LandscapingPlanAndDetails_L1

18_LandscapingNotes_L2