Site/Subdivision Plans –

Thomas Brooks Park Baseball Fields Renovations and Trail Repair - 18-DP-0699

The plan document files and images contained on this site are not considered record or as-built drawings, and therefore should not be relied upon or used in such manner.

Site/Subdivision Plan Index

001 - 1 Cover

002 - 2 General Notes And Const Seq

003 - 3 Traffic Control Plan

004 - 4 Existing Conditions Plan

(2.2 MB)

005 - 5A Erosion Control - (Site-Alternate)

(1.7 MB)

006 - 5 Erosion Control Plan - (Site-Base)

(1.7 MB)

007 - 6 Erosion Control - (Fields)

(1.6 MB)

008 - 7 Demolition Plan - (Site-Base)

(1.9 MB)

009 - 8 Demolition Plan - (Fields)

(1.3 MB)

010 - 9A Grading and Storm South - (Alternate 3 and 4)

(2.4 MB)

011 - 9 Grading and Storm South - (Site-Base)

(1.7 MB)

012 - 10A Grading and Storm North - (Alternate 5)

(1.7 MB)

013 - 10 Grading and Storm North - (Site-Base)

(1.6 MB)

014 - 11 Grading Plan Fields 5 and 8 - (Fields)

(1.1 MB)

015 - 12 Overall Plan Sheets - Trail Slope Repair-(Fields)

016 - 13 Plan and Profiles South

017 - 14 Plan and Profiles - North

018 - 15 Plan and Profiles

019 - 16 Trail Slope Repair

020 - 17 Planting Plan (Site)

(1.8 MB)

021 - 18 Planting Plan (Fields)

(2.0 MB)

022 - 19 Field Sections and Vertical Details

023 - 20 Details

(1.5 MB)

024 - 21 Details

(1.1 MB)

025 - 22 Details

(1.1 MB)

026 - 23 Details

(1.5 MB)