Site/Subdivision Plans –

Village at The Park Phase 2 Subdivision - 17-DP-1415

The plan document files and images contained on this site are not considered record or as-built drawings, and therefore should not be relied upon or used in such manner.

Site/Subdivision Plan Index

C0.0 COVER

C0.1 TABLES

C1.0 EXISTING CONDITIONS

(1.2 MB)

C2.0 SITE PLAN

(1.6 MB)

C3.0 UTILITY PLAN

(1.6 MB)

C4.0 GRADING DRAINAGE PLAN

(2.1 MB)

C4.1 STORMWATER WETLAND DETAIL

C5.0 PHASE 1 EROSION SEDIMENT CONTROL PLAN

(1.0 MB)

C5.1 PHASE 2 EROSION SEDIMENT CONTROL PLAN

(2.2 MB)

C5.2 PHASE 1 NPDES STABILIZATION PLAN

(1.5 MB)

C5.3 PHASE 2 NPDES STABILIZATION PLAN

(2.2 MB)

C6.0 CHIPLEY DRIVE PLAN & PROFILE

(2.2 MB)

C6.1 WALES WAY GRAVITY SEWER OUTFALL PLAN PROFILE

(1.7 MB)

C7.0 LANDSCAPE PLAN

(1.7 MB)

C8.0 STRIPING SIGNAGE PLAN

(1.0 MB)

C9.0 SITE DETAILS

(8.0 MB)

C9.1 SITE DETAILS

(4.6 MB)

C9.2 WATER DETAILS

(8.9 MB)

C9.3 RECLAIMED WATER DETAILS

(7.1 MB)

C9.4 SEWER DETAILS

(6.2 MB)

C9.5 STORM DRAINAGE DETAILS

(6.0 MB)

C9.6 EROSION & SEDIMENT CONTROL DETAILS

(11.7 MB)