Site/Subdivision Plans –

White Oak Creek Greenway from MacArthur to Davis - 16-SP-077

The plan document files and images contained on this site are not considered record or as-built drawings, and therefore should not be relied upon or used in such manner.

Site/Subdivision Plan Index

001_cover-Grading and Drainage

002_A-1-index-notes

003_1A-2-notes

004_1B-Symbols

005-1D-1-exist cond West

006-1D-2-exist cond East

007-2A-1-typsections

008-2A-2-typsections

009-2B-1-conc steps to field

010-2B-2-conc steps to trail

011-2B-3-conc steps details

012-2B-4-wood rail detail

013-2B-5-C-intersection detail

014-2B-6-C-CSXT RR-xing detail

015-2B-7-constr details

016-2C-1-TOC constr details

017-2C-2-TOC constr details

018-2C-3-TOC constr details

019-2C-4-TOC constr details

020-2C-5-TOC constr details

021-2C-6-TOC constr details

022-2D-1-drainage details

023-3A-1-fence and rail summary

(1.1 MB)

024-3D-1-pipe chart

025-4-site plan West

026-5-site plan East

027-6-trailprofile

028-G1-grading and drainage W

029-G2-grading and drainage E

030-TMP-1-trafcontrl and markings

031-TMP-2

032-SD-1-special sign

033-PS-1-pave-mrkn and sign planW

034-PS-2-pave-mrkn&sign planE

035-PS-3-sign details

036-PS-4-NCDOT-pavmt-mrkg

037-SR1-strm reloc plan and profile

038-SR2-strm reloc sect

039-SR3-stream reloc details

040-SR4-stream plant det

041-L101-LANDSCAPE PLAN

(3.3 MB)

042-L102-LANDSCAPE PLAN

(2.0 MB)

043-L103-LANDSCAPE PLAN

(2.0 MB)

044-L200 - LANDSCAPE SCHED& NOTES

(2.7 MB)

045-L201 - LANDSCAPE DETAILS

(1.6 MB)

046-EC-1A-denud area

047-EC-1-ECplan-clear and grub

048-EC-2-ECplan-clear and grub

(1.0 MB)

049-EC-3-ECplan-construction

050-EC-4-ECplan-construction

(1.0 MB)

051-EC-5-ECdetails

052-EC-6-ECdetails

053-EC-7-ECdetails

054-EC-8-ECdetails

055-EC-9-ECdetails

056-EC-10-ECdetails

057-EC-11-ECdetails

058-EC-12-soil stabl-chart

059-RF-1-Reforestation Detail

060-S-1-Seeding Plan

(2.0 MB)

061-SIG-1 Signal Upgrade

062-SIG-2 Electrical Detail

063-SIG-P1-ped pushbutton details

064-SIG-P2-ped pushbutton details

065-SIG-P3-ped pushbutton details

066-UC-1-utility plans

067-UC-2-utility detail

068-UC-3-utility detail

069-UC-4-utility detail

070-E-001 Electrical Schedules

071-E-101 Electrical Site Plan

(1.2 MB)

072-E-102 Tunnel Lighting Plan

073-PT01-boardwalk notes

(1.4 MB)

074-PT02-boardwalk plan§ion

(1.0 MB)

075-PT03-boardwalk plan&long sect

(1.1 MB)

076-PT04-boardwalk plan&details

(1.2 MB)

077-PT05-boardwalk plans

(1.1 MB)

078-PT06-boardwalk plan and details

(1.1 MB)

079-PT07-bw railing details

080-PT08-boardwalk installation

081-ST-01-tunnel plan and long sect

082-ST-02-tunnel notes

083-ST-03-tunnel foundn plan

084-ST-04-tunnel longchordlayout

085-ST-05-tunnel wall1elev

086-ST-06-tunnel wall1sects

087-ST-07-tunnel wall2elev

088-ST-08-tunnel wall2sects

089-ST-09-tunnel wall typ details

090-ST-10-tunnel details

091-ST-11-tunnel details

092-ST-12-tunnel flr details

093-ST-13-tunnel hndrl details

094-W-1-Retaining wall 3

095-W-2-Retaining wall 4

096-W-3-Retaining wall 5

097-W-4-Retaining wall 6

098-W-5-Retaining wall 7

099-W-6-Soldierpile wall detail

100-W-7-Segmental wall detail

101-W-8-CIP gravity wall detail

102-X-1-trail sections

103-X-2-trail sections

104-X-3-trail sections

105-X-4-trail sections

106-X-5-trail sections

107-X-6-trail sections

108-X-7-trail sections

109-X-8-trail sections

110-X-9-trail sections

111-X-10-trail sections

112-X-11-rr sections

113-X-12-rr sections

114-X-13-rr sections

115-X-14-MacArthur sections

116-X-15-MacArthur sections

117-X-16-MacArthr sections